External and internal decorations

"A designer knows when he has reached perfection not when there is nothing left to add but when there is nothing left to take away."

Antione de Sainte-Exupery

We got the quote from our contractor for Phase 1 of the bedroom and bathroom remodel, and while the line item pricing seems totally fair and reasonable, the total price is just more than we want to spend on this part of the house remodel. I’d rather save as much money as we can on this phase so that we can splurge on the bathroom remodel. Now I need to go through the line item quote that our contractor gave us and see if there are any items I can do myself to bring the cost down. And I’m so thankful to have found a contractor who’s actually willing to let me do that! So many contractors don’t want homeowners getting “in the way” and get pretty prickly if homeowners want to do parts themselves for fear that it’ll slow down the project. But Mike is very reasonable about working with homeowners to get the job done however it needs to get done. So here’s how the cost of the project breaks down, and this doesn’t include the master bathroom. The master bathroom will be Phase 2 of this project. Master Bedroom (soon to be bathroom) and Hallway Demo/Frame — […]

The post Phase 1 Bedroom & Bathroom Remodel – The Cost + DIY vs. Hiring Out appeared first on Addicted 2...


We got the quote from our contractor for Phase 1 of the bedroom and bathroom remodel, and while the line item pricing seems totally fair and reasonable, the total price is just more than we want to spend on this part of the house remodel. I’d rather save as much money as we can on this phase so that we can splurge on the bathroom remodel. Now I need to go through the line item quote that our contractor gave us and see if there are any items I can do myself to bring the cost down. And I’m so thankful to have found a contractor who’s actually willing to let me do that! So many contractors don’t want homeowners getting “in the way” and get pretty prickly if homeowners want to do parts themselves for fear that it’ll slow down the project. But Mike is very reasonable about working with homeowners to get the job done however it needs to get done. So here’s how the cost of the project breaks down, and this doesn’t include the master bathroom. The master bathroom will be Phase 2 of this project. Master Bedroom (soon to be bathroom) and Hallway Demo/Frame — […]

The post Phase 1 Bedroom & Bathroom Remodel – The Cost + DIY vs. Hiring Out appeared first on Addicted 2 Decorating®.


Read full article on addicted2decorating.com


Garage Doors

Environmental Restoration

Asphalt Paving

Elite Fence

Floor System